Atikwa lake lodge was hit hard by last winter. Today we finished the last power line and mast that was ripped off cabin 7. Also the deck on cabin 7 collapsed due to the snow load and we finally got that jacked up and new supports flown in and installed. Generator is fixed and the solar is working but not quite right. The east dock is still messed up but may not get repaired this year. Our repairs budget was used up pretty much the first day! Have to get by the way it is for now. Bugs are bad this year! I thought with a hard winter they would be better but I was wrong. I’ve seen worse but still bad. There has hardly been any wind and that really makes it worse. Water level has been going down which we badly need but last night it rained about an inch. Our little west dock we use for boat repair is missing and we want it back. Winter took it away so keep your eyes open because its floating somewhere on the lake.
– Todd